Roof is almost complete
The great news on the construction is that the installation of the roof above the fourth floor is substantially complete.
In addition, the sheet rock has been started on the second floor. Brick is now being installed on the north face and is complete on the east face.
The windows have been installed on the north and east face of the building.
It is really starting to take form now and look like part of the medical center.
Posted by: Ted Bloomfield who posted it at 9/10/2009 11:06:49 AM
|